    Hi,
    can anyone help me in the below case.
    I am using OTM V6.2.4 version.

    In my Configuration, I have created,
    Packaged Item1 = 1 KG, 1 CUFT and THU = pallet1 (1*1)
    Packaged Item2 = 2 KG, 2 CUFT and THU = pallet2 (1*1)

    Order Release1:
    Ship Unit EACH (THU) with qty 100 and Item PI1.
    Order Release1 becomes 200 KGs & 5 CUFT

    Order Release2:
    Ship Unit EACH (THU) with qty 50 and Item PI2.
    Order Release2 becomes 100 KGs & 3 CUFT

    Order Release3:
    Ship Unit EACH (THU) with qty 50 and Item PI1.
    Order Release3 becomes 70 KGs & 3 CUFT

    My Equipment Group capacity is 300 KGs & 20 CUFT. I have marked the ship units as splittable.

    Now if I do bluk plan the above orders, OTM plans two shipments and splits each of the Line into both the shipments.
    Shipment S1 = OR1 (SU with PI1) + OR2 (SU with PI2) + OR3 (SU with PI1)
    Shipment S2 = OR1 (SU with PI1) + OR2 (SU with PI2) + OR3 (SU with PI1)

    As per my requirement, I should get TWO shipments with following split:

    Shipment S1 = OR1 (SU with PI1) + OR3 (SU with PI1)
    Shipment S2 = OR2 (SU with PI2) + OR3 (SU with PI1)

    In short, SAME items should come in one shipment first before other items are planned on the shipment.

    I tried witH below parameters also.
    USE 3D BASED LOAD CONFIGURATION = TRUE
    LOAD CONFIG GROUP SHIP UNITS WITH SAME THU = TRUE (Default value)

    But still I am not getting the desired split.

    Anyone come across this type of scenario.
    Please guide me.