When the shipments are created from an order release.The shipments are built on to the multiple equipments.
Requirement:
Equipment Group Capacities Available : 34 TONS (Maximum)
we have an order release with Gross Weight: 50 000 KGS
The shipments should be build for orders whose Gross Weight is less than 34 TONS.However for me the shipments are built for orders whose weights are greater than 34 tons also with multiple equipments.
We want order release whose weights are less than 34 TONS should be planned.Orders whose weights are greater than 34 TONS should not be planned.
Any thoughts ,how the above requirement can be configured into OTM
Regards,
Surender
Requirement:
Equipment Group Capacities Available : 34 TONS (Maximum)
we have an order release with Gross Weight: 50 000 KGS
The shipments should be build for orders whose Gross Weight is less than 34 TONS.However for me the shipments are built for orders whose weights are greater than 34 tons also with multiple equipments.
We want order release whose weights are less than 34 TONS should be planned.Orders whose weights are greater than 34 TONS should not be planned.
Any thoughts ,how the above requirement can be configured into OTM
Regards,
Surender
Comment