All
I have a scenario where when planning a shipment the operational location is not populating in the parent location field. What has been setup is a location with a location role of AIRPORT. Then assigned a different location as the operational location in the routing tab. Then on the itinerary I checked the Use operational location on the leg.
When planning the shipment it does not assign. It also does not assign when I use the Shipment action Assign Operational Location. The action allows me to select the parent location but does not commit it. Any Ideas?
Thanks
I have a scenario where when planning a shipment the operational location is not populating in the parent location field. What has been setup is a location with a location role of AIRPORT. Then assigned a different location as the operational location in the routing tab. Then on the itinerary I checked the Use operational location on the leg.
When planning the shipment it does not assign. It also does not assign when I use the Shipment action Assign Operational Location. The action allows me to select the parent location but does not commit it. Any Ideas?
Thanks
Comment