Hi,
Can some one explain how Rate Factor rule can be defined considering the fuel index.
I need to Know if Rule has been defined for certain Max Rule factor value lets say 3 and Cost Value =10 (Cost type is look up). Then what is the cost value here?
If increment in Factor increase is set to 0.5 and Cost Increase to 1.0 then as per webhelp when accessorial is attached it should have the value of 14. However in my case I am getting this value as 1% of Shipment base Cost. where from this 1% is coming.
Thanks in advance.
Regards
Vipin
Can some one explain how Rate Factor rule can be defined considering the fuel index.
I need to Know if Rule has been defined for certain Max Rule factor value lets say 3 and Cost Value =10 (Cost type is look up). Then what is the cost value here?
If increment in Factor increase is set to 0.5 and Cost Increase to 1.0 then as per webhelp when accessorial is attached it should have the value of 14. However in my case I am getting this value as 1% of Shipment base Cost. where from this 1% is coming.
Thanks in advance.
Regards
Vipin
Comment