Announcement

Collapse
No announcement yet.

Procurement : Build rate action and Computed Cost

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • Procurement : Build rate action and Computed Cost

    Hi,

    I am currently working on OTM procurement module and I am facing below issues:-
    1) Build Rate action is not working.
    2) At per the help guide the action populates OTM rate tables within the procurement database. Can we get
    the details of this table?
    3) In each bid system automatically calculates Computed Cost for a bid based on which Solution will select bid for a Bid
    Round. In our case system is taking flat cost entered in bid as Computed Cost
    and is not considering Variable Cost.
    4) Help option and User guide does not talk about the concept of Computed Cost, Overriding Minimum Cost, Overriding
    Maximum Cost, Minimum Percentage of Loads and Maximum Percentage of Loads and
    how computed cost is calculated. Please suggest some document on these
    concepts.

    Regards
    Arpit Tiwari
Working...
X
😀
🥰
🤢
😎
😡
👍
👎